Straddle version with try of evaporation water of condenses:
Before mounting the unit prepare the cuts and holes in the cold room wall shown in the picture.
Fix the unit in place with the appropriate screws (Fig.3).
drainage of the small basin evaporator and vaschetta the evaporation water of condenses (Fig.2), using the tube
supplied with the unit.
Fig.1
Fig.2
A
B
C
mm
mm
mm
ZM1 223
300
366
ZM2 362
300
644
ZM3 263
435
634
ZM3 P 362
300
644
Drainage water
of condenses Ø
14mm
To execute the connection between the
D
E
mm
mm
55
40
55
40
65
45
55
40
Fig.3
22