ENGLISH
QE-SPF
Aesthetic wall spacer frame(fig. 1÷4)
Fig.1: QE SPF assembly to cover adapter QE FBA.
Fig.2: QE SPF assembly to cover the irregular edges of holes in walls.
Fig.3: QE SPF assembly to hide a protrusion from the plasterboard box (rear discharge).
Fig.4: Final assembly: position the front QE panel on the QE-SPF frame.
QE-CFR
Infill frame (fig. 5÷6)
Hides imperfections due to an incorrectly finished installation on a plaster or on tiles or in openings on recesses
that are too large that the QE would not be able to cover completely. The frame is mounted between the wall
and the front part of the QE.
QE-SRK
Kit for extraction from a second room (fig. 7÷12)
Fig 7
0 wall recessed box
1 wall flange
2 filter
3 frame
4 front panel
Fig 8
A.Maximum depth of recess: 40 mm
B.Optional screws: if used, it is necessary to drill the holes on the rear pre-recessed wall of the wall flange
48