4 – TECHNICAL SPECIFICATIONS
Power
Voltage
Temperature at nozzle outlet, approx.
Supply cord
Protection rating
5 - DESCRIPTION (fig. 1)
1 – Ergonomic handle.
2 – Hanging point.
3 – Supply cord.
4 – On / Ventilation / Off switch.
5 – Air inlet vent
6 – Main power module
7 – Device carrier
8 – Nozzle
6 – START-UP – FIRST USE (Fig1)
Starting up
Ensure the nozzle (8) is properly fitted and the switch (4) is
set to 'OFF' (Fig2A). Connect the GREEN POWER with the
supply cable (3) onto the power supply network after
checking the safety measures are observed.
Check that nothing is placed in front of the nozzle when
switching on the GREEN POWER.
Start the GREEN POWER by setting the switch to the
'heating' position (Fig2B).
Hold the GREEN POWER with its ergonomic handle (1).
For more comfort, you can adapt your grip on the device by
holding the ergonomic handle higher or lower (Fig3).
Warm up the device for 45 seconds to reach the operating
temperature.
To eliminate weed, apply the nozzle (8) onto it while letting
it rest on the ground for 3 seconds.
1600 watt
220-240V / 50Hz
600°C
0.3 m – H05 RNF
IPX0
Stopping the device
Before stopping the device completely, a cooling phase is
required.
Set the switch (4) to the "Ventilation" position (Fig2C).
Ventilation must last 30 seconds minimum.
Once this operation is complete, you can set the switch to
OFF (Fig2A) to switch off the GREEN POWER.
7 - STORAGE
Check the device is completely cold before storing it.
The device can be laid on the ground on its carrier (7) or
hung to the wall by its anchoring point (2).
7
ENGLISH