Kermi BH200 Instrucciones De Montaje página 4

Consolas verticales para radiadores planos
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 8
Packaging and scope of delivery
Remove the packaging from the radiator
(Fig. 2).
Inspect the contents of the soil stand brack-
et package for completeness and damage.
10
2b
Description
1
Bracket base
2a Supporting pipe T22
2b Supporting pipe T33
3
Lug plate
4
Sealing cap
5
Bracket block
6
Support
7
Hook
8
Washer
9
Hexagon nut
10 Grub screw
Number of soil stand brackets
Use the indicated number of soil stand
brackets for installation in accordance with
the steel panel radiator's length (Fig. 3).
Observe all information, especially the
technical data and limitations on use.
Transport and store only in the protective
packaging.
Pre-assembly of the soil stand bracket
Prepare tools and fixing material (screws,
washers and anchor) (Fig. 1).
4
Insert the sealing caps (4) into the two end
openings of the supporting pipe (2a/2b)
(Fig. 4).
Insert the bracket block (5) into the open-
ings provided in the supporting pipe (2a/2b)
(Fig. 4).
Slide the pre-assembled supporting pipe
onto the bracket base and adjust a dis-
6
tance of 150 mm from the finished floor
3
(Figs. 5/6).
Using the grub screws (10), fix the support-
7
ing pipe hand-tight (Fig. 6).
1
Insert the support (6) into the top of the
5
bracket base (recess facing toward the
4
front) (Fig. 6).
2a
For the installation dimensions of the soil
8
stand brackets on the radiator, refer to the
9
table in Fig. 7.
4
Installing brackets
Align the soil stand brackets on the floor at
the specified spacing and mark the holes to
be drilled (Fig. 8).
Drill the holes at the marked locations
(Fig. 9).
Place the soil stand brackets in position,
align and, using suitable anchors, wash-
1
1
ers and screws (4 screws per bracket, max.
1
Ø 10 mm), fasten the brackets to the floor
1
(Fig. 10).
1
1
2
2
Installing the radiator
2
2
Carefully place the radiator on the bracket
1
1
bases (Fig. 11).
1
1
Attach the lug plates (3) to the top of the
1
1
radiator at the same position as the soil
1
1
stand brackets (Fig. 12).
2
2
Attach hook (7) to the lower lug on the
lug plate (3) and insert hook through the
oblong hole in the supporting pipe (2a/2b).
Using the hexagon nut (9) and the washer
(8), fasten hook hand-tight (Fig. 13).
After loosening the grub screws (10)
and the hexagon nuts (9), align the ra-
diator horizontally. Then tighten the grub
screws (10) and the hexagon nuts (9) again
(Figs. 13/14).
Cover the radiator completely again with
the packaging (Fig. 15).

Publicidad

Tabla de contenido
loading

Tabla de contenido