3 ASSEMBLY
3.1 MACHINES WITH FIXED DECK
CONNECTIONS
Example of fixed deck connections, see 3:C and
4:G.
1. Place the deck in position in front of the ma-
chine.
2. Check that the deck mounts are installed on the
machine as follows.
Park 2WD:
• Deck mount (4:G).
• Washer (4:F).
• Lock pin (4:E).
Park 4WD, Villa, Ready:
• Washer (3:D). Only machines up to and in-
cluding 2006.
• Deck mount (3:C).
• Washer (3:B).
• Circlip (3:A).
3. Remove pins and washer (2:C, 2:D).
4. Screw the arms into each other. See fig. 5.
5. Set the maximum cutting height.
6. Fit the belt on to the machine pulley.
7. Perform the cutting deck basic setting. See 3.4.
8. Tension the belt as follows.
Park 2WD:
Tension the belt with the belt idler. The belt
idler should be on the left side of the belt
viewed from the driver's position. See fig. 10.
Park 4WD:
Grip the belt tensioner's lever with your left
hand. Pull the lever and apply the tensioner to
the outside of the belt with your right hand. See
fig.9.
Villa, Ready:
Tension the belt with the belt idler. The belt
idler should be on the inside of the belt and pull
out to the left (viewed from the driver's posi-
tion). See fig. 11.
9. Suspend the unit in the implement lifter. See fig.
13.
10.If the deck has electrical cutting height adjust-
ment, connect the cable to the machine's front
right socket. See fig. 16.
3.2 MACHINES WITH QUICK CON-
NECTIONS
Example of quick connections, see fig. 12.
1. Place the deck in position in front of the ma-
chine.
2. Check that the quick connections are fitted to
the machine according to their supplied sepa-
rate instruction.
ENGLISH
3. Check that the deck arms are screwed into place
in the quick connections. If this is not the case,
screw them into place. See fig. 12.
4. Set the maximum cutting height.
5. Set the quick connections in their rear positions.
See their supplied separate instruction.
6. Fit the belt on to the machine pulley.
7. Tension the belt as follows.
Park 2WD:
Tension the belt with the belt idler. The belt
idler should be on the left side of the belt
viewed from the driver's position. See fig. 10.
Park 4WD:
Grip the belt tensioner's lever with your left
hand. Pull the lever and apply the tensioner to
the outside of the belt with your right hand. See
fig.9.
Villa, Ready:
Tension the belt with the belt idler. The belt
idler should be on the inside of the belt and pull
out to the left (viewed from the driver's posi-
tion). See fig. 11.
8. Set the quick connections in their front posi-
tions. See their supplied separate instruction..
9. Suspend the unit in the implement lifter. See fig.
13.
10.Perform the cutting deck basic setting. See 3.4.
11.If the deck has electrical cutting height adjust-
ment, connect the cable to the machine's front
right socket. See fig. 16.
3.3 TYRE PRESSURE
Adjust the tyre pressures according to the table be-
low.
Machine
Park
Villa
Ready
3.4 BASIC SETTING
In order for the cutting deck to cut optimally, the
correct basic setting is required. The deck is in the
basic setting when its rear edge is 5 mm above its
front edge. This means that the deck is inclined
forwards.
Move the deck to the basic setting by lifting and
securing as follows.
On machines with 17" wheels: Install the washers
and the pins in the top hole. See fig. 14.
On machines with 16" wheels: Install the washers
and the pins in the middle hole. See fig. 15.
EN
Pressure (bar/psi)
Front
Rear
0,6/9
0,4/6
0,4/6
1,2/17
0,4/6
1,2/17
31