Fig. 5
2. Drill a hole in the wall
≥
3. Connective pipe and drainage installation
Fig. 6
1.
When connecting extension drain hose, insulate the connecting part of extension drain hose with a
shield pipe, do not let the drain hose slack.
Fig. 7
Connective pipe
2.
For the left-hand and right-hand piping, remove the pipe cover from the side panel. The pipe cover
must be kept as it may be used when relocate the air conditioner to any other place.
4
88
≥
≥