Wiring the GRAFIK Eye QS Control Unit (continued):
Line Voltage Wiring Details (continued)
Step 4: Connect line voltage and loads
to control unit.
• Strip 5/16 in (8 mm) of insulation off the line
voltage/mains cables in the wallbox.
5/16 in
(8 mm)
• Connect the line voltage/mains, ground,
and load wires to the appropriate terminals
on the back of the control unit.
L: Hot/Live
N: Neutral
: Ground
Terminals 1– 6: Dimmed/Switched
line voltage outputs
The recommended installation torque is
5.0 in-lb (0.6 N∙m) for line voltage/mains
connections and 5.0 in-lb (0.6 N∙m) for the
earth/ground connection.
Note: See the zone setup section for a
list of compatible load types and
instructions for programming the
GRAFIK Eye QS control unit to
properly recognize them.
Notice: Risk of damage to unit. GRAFIK Eye QS control units must be installed by a
qualified electrician in accordance with all applicable regulations and building codes.
Improper wiring can result in damage to control units or other equipment.
Note: To avoid overheating and possible damage to equipment, do not install control units
to dim receptacles, motor-operated appliances, or fluorescent lighting not equipped with
Lutron Hi-lume, Eco-10, Tu-Wire, electronic dimming ballasts, or other devices approved
for your location. In dimmed magnetic low-voltage circuits, you can prevent transformer
overheating and failure by avoiding excessively high current flow. Do not operate control
units with any lamps removed or burned out; replace any burned out lamps immediately;
use only transformers that incorporate thermal protection or fused primary windings.
Control units are designed for residential and commercial use, for indoor use only.
For additional information, see the complete installation and operation guide at www.lutron.com/qs
GRAFIK Eye QS Control Unit Quick Installation and Operation Guide