NOTE: If the ceiling is very low do steps 6-10 before step 5
5.
[IF FIXING TO WALL] FIX TO WALL AND FLOOR Use fixtures appropriate for what you are
fixing to. Floor fixing is not necessary but helps with stability. Check for underfloor heating
before drilling into floor.
materials:
6 x M10x50mm RAWL plugs
2 x ST8 150mm bolts
4 x ST8 50mm bolts
6 x M8 washer
8
VFM-FM_manual_en.doc