Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 37

Installation

GB
4. Installation
4.1 Installation
Fig. 2: Installation
Fig. 3: Installing the inlet and outlet lines
16
1. Distribute the granulate evenly in the neutralisation pipe by shaking
Attention! If the inlet and outlet are completely covered with granulate, there is
the risk of getting plugged!
1
2. Floor installation: Fasten the brackets (1) at a suitable position on the floor
with anchors and screws and stick the neutralisation pipes in the brackets.
Wall installation Fasten the brackets (1) at a suitable location on the wall with
anchors and screws, stick the neutralisation pipes in the brackets
3
2
3. Loosen the union nuts (pos. 3 and 4) f the inlet and outlet connection, push the
inlet and outlet pipe (pos. 2 and 5, DN 40) fully into the terminals and then
tighten the union nuts again.
4. Stick the outlet hose of the gas condensing boiler with the feed line of the neu-
tralisation unit ( Fig. 3 , pos. 2)
Caution! The connection to the gas condensing boiler must be designed to be
backflow-proof!
Neutralisation unit NEOP 70
1
5
4
7311617-02 08.13

Publicidad

Tabla de contenido
loading

Productos relacionados para BRÖTJE NEOP 70

Tabla de contenido