• Pass the Cables into the slots on the threaded pawls (a) and
tighten the cable locking screws (b) into the pawls
themselves.
• When the operation has been
completed, the result should be as
shown in the figure for all 4
cables.
EN
• At this point, all 4 cables are now
connected to the Plate.
Tension the Cables by pushing them
upwards, so that they slide inside the
cable locking screw and out through the
slot in the threaded pawl.
This is possible because the cable
locking screw involves a system that
allows the Cable to slide in one direction
only, preventing it from sliding in the
other direction.
Make sure that the Cables are all the
same length, to facilitate final levelling
operations. The left front cable must not
be slacker than the others.
4
49