SPLIT
EN
PIPING AND CABLE CONNECTION -
2- Connect the charging unit gauges and run
empty for at least 30 minutes. Introduce the
oil followed by the R-134a refrigerant gas in
accordance with the following table.
Total pipe length
6 m
7 m
8 m
9 m
10 m
11 m
12 m
13 m
14 m
15 m
16 m
17 m
C.C. Oil to be
introduced
20 c.c.
35 c.c.
50 c.c.
65 c.c.
80 c.c.
95 c.c.
110 c.c.
120 c.c.
135 c.c.
150 c.c.
165 c.c.
180 c.c.
26
Air conditioning for vehicles
Gas load to be
introduced
450 grs.
500 grs.
550 grs.
600 grs.
650 grs.