Descargar Imprimir esta página

Ariens Pro Zoom Serie Manual Del Operador página 14

Publicidad

Idiomas disponibles

Idiomas disponibles

1.Locate the left-side ROPS m ount pocket
onthe inside ofthe frame a bove the
wheel motor. Mount the left s ide base
weldment
(item 9)inthe pocket using
two 1/2 x31/2 in.hex bolts ( item 4),two
1/2 in. s pring lock w ashers
(item 6)and
two 1/2 in. h ex nuts ( item 5).Do not f ully
tighten hardware.
See Figure 5.
_9
4
8
5 ROPS Mount
Pocket
Figure 6
2.Locate the right-side
ROPS m ount
pocket onthe inside ofthe frame a bove
the wheel motor. Mount the right side
base w eldment
(item 8)inthe pocket
using t wo 1/2 x3 1/2 in. h ex bolts ( item
4), t wo 1/2 x31/2 in.hex bolts ( item 4)
and two 1/2 in. s pring lock w ashers
(item
6).Do not f ully tighten hardware.
See
Figure 6.
Install
Center
Tube
1. Position center tube weldment (item 10)
in right- and left-side base weldments
with the top angle facing the rear of the
unit. Secure with two 1/2 x 3 1/4 in. hex
bolts (item 3) and two 1/2 in. center lock
nuts (item 7). Ensure that hinge bolts are
positioned to the rear of the unit. Do not
fully tighten. See Figure 7.
10
Figure 7
2. Install two ROPS lock pins (item 1) and
two 5/16 x 3/4 in. round knobs (item 2).
See Figure 7.
3. Torque lower mounting hardware
installed in steps 1 and 2 of Install Base
Weldments on page 13 to 80 Ibf-ft (109
N,m).
4. Tighten upper mounting hardware
installed in step 1 until they just contact
the hinge plate. To ensure that rollover
bar can lower and raise correctly, do not
overtighten.
Tighten round knobs to prevent center tube
from rattling during operation.
Fill Fuel Tank
Fill fuel tank. DO NOT OVERFILL! See
FILLING FUEL TANK on page 19
GB - 14

Publicidad

loading

Este manual también es adecuado para:

Pro zoom 54Pro zoom 60992806992807