Descargar Imprimir esta página

Laying The Screed - OBO Bettermann UDHome2 BV Instrucciones De Montaje

Cubeta sin entalladura de pavimento con soporte de montaje para sistema de modul 45
Ocultar thumbs Ver también para UDHome2 BV:

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 27
I nsert the M25 installation pipe (accessory)
max . 5 mm into the service unit, and fix it
outside, on the floor .
Tip: If screed laying follows, then place the
mounting support loosely into the service unit for
storage .

Laying the screed

C lose the hinged cover and attach the
mounting cover .
Note: We recommend routing the screed with-
out an additional separation layer . A separation
layer can be used to reduce noise transmission,
although this reduces fixed anchoring of the ser-
vice unit in the screed .
L ay the screen flush to the top edge of the
mounting cover and work it up to the service
unit .
EN
23

Publicidad

loading

Productos relacionados para OBO Bettermann UDHome2 BV