Connecting To Gas Supply - Procom Heating MNSD100TBA Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

WARNING: A qualified ser-
vice technician must connect
heater to gas supply. Follow all
local codes.
WARNING: This appliance
requires a 3/8" NPT (National
Pipe Thread) inlet connection to
the pressure regulator.
WARNING: For natural gas,
Never connect heater to private
(non-utility) gas wells. This gas
is commonly known as wellhead
gas.
WARNING: Do not over-
tighten gas connections.
CAUTION: Use only new,
black iron or steel pipe. Inter-
nally tinned copper tubing may
be used in certain areas. Check
your local codes. Use pipe of
1/2" diameter or greater to allow
proper gas volume to heater. If
pipe is too small, undue loss of
pressure will occur.
CAUTION: For propane gas,
never connect heater directly
to the gas supply. This heater
requires an external regulator
(not supplied). Install the exter-
nal regulator between the heater
and gas supply. Gas supplier
provides external regulator for
natural gas. The installer pro-
vides the external regulator for
propane gas.
16
INSTALLATION

CONNECTING TO GAS SUPPLY

www.usaprocom.com
CAUTION: For natural gas,
check your gas line pressure
before connecting heater to gas
line. Gas line pressure must be
no greater than 9.5" of water. If
gas line pressure is higher, heater
regulator damage could occur.
CAUTION: Avoid damage to
regulator. Hold gas regulator
with wrench when connecting
into gas piping and/or fittings.
CAUTION: Use pipe joint
sealant that is resistant to gas
(Propane or Natural Gas).
Before installing heater, make sure you have
the items listed below:
• external regulator for propane unit only
(supplied by installer)
• piping (check local codes)
• sealant (resistant to natural gas and pro-
pane gas)
• equipment shutoff valve*
• test gauge connection*
• sediment trap
• tee joint
• pipe wrench
• flexible gas hose (check local codes)
* A CSA design-certified equipment shutoff
valve with 1/8" NPT tap is an acceptable al-
ternative to test gauge connection. Purchase
the optional CSA design certified equipment
shutoff valve from your dealer.
Typical Inlet Pipe Diameters
Use 3/8" black iron pipe or greater. Installa-
tion must include an equipment shutoff valve,
union, and plugged 1/8" NPT tap. Locate NPT
tap within reach for test gauge hook up. NPT
tap must be upstream from heater (see Figure
15, page 17).
IMPORTANT: Install an equipment shutoff
valve in an accessible location. The equip-
ment shutoff valve is for turning on or shutting
off the gas to the appliance.
200213-01C

Publicidad

Capítulos

Tabla de contenido

Solución de problemas

loading

Tabla de contenido