Thermometer Ball Valves - Daikin 156077 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 133
6
Commissioning
6.1
Commissioning the product
 Verify that the thermometer ball valves are in 0° setting.
1. Perform a pressure test.
2. Check all screwed connections for tightness.
3. Set to ball valves to 45° position for filling of the system.
4. Fill the system and apply pressure.
5. Set the ball valves to 0° position.
6.1.1

Thermometer ball valves

Thermometer ball valves
7
Operation
Proper operation is only possible if the thermometer ball valves and the ball
valves are open (0° setting, see chapter "Thermometer ball valves").
Commissioning
Normal operation:
Gravity brake active
90 ° Maintenance:
Ball valve closed
45 ° Commissioning, filling, vent-
ing, flushing:
Both ends open (gravity
brake not active)
FA PG - 06/2019 - 008.15 442 99_02 - EN
EN
21

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

156075PgdkPgmk

Tabla de contenido