Siemens SITRANS FCS400 Guia De Inicio Rapido página 4

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

2. Horizontal installation, tubes down (recommended for liquid applications)
Figure 3-4 Horizontal orientation, tubes down
3. Horizontal installation, tubes up (recommended for gas applications)
Figure 3-5 Horizontal orientation; tubes up
Note
Hygienic applications
In 3A and EHEDG certified hygienic applications the flowmeter must be installed vertically as shown in 1 above.
Installation in a drop line
Installation in a drop line is only recommended if a pipeline reduction or orifice with a smaller cross-section can be installed
to create back-pressure and prevent the sensor from being partially drained while measuring.
Back pressure orifice
On / off valve
Figure 3-6
Installation in drop line
4
FCS400 sensor
A5E03649755-008, 05/2014

Publicidad

Tabla de contenido
loading

Tabla de contenido