Heating System - Palazzetti TC 120 Manual De Usuario

Ocultar thumbs Ver también para TC 120:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

4.6
System's plan No. 6
PLAN No. 6
S1
Functioning
:
The pump1 starts at the threshold A01.
The 3 outputs valve is commutated to the boiler
at the threshold A04.
The 3 outputs valve with spring return is normally to the fireplace.
Make sure the boiler has a security dissipation.
Used IN/OUT
Probe1
Pompa1
Probe2
3 outputs valve
Parameter
C- -
A10
P01
P02
Parameter
A01
A03
I01
I03
Pag.: 56/60
TERMOPALEX WITH PARALLEL
AND INERTIAL ACCUMULATION SYSTEM
C1: controller
P1
SERIGRAPHY
CONNECTORS
Probe1
Pump
Probe2
AUX
INSTALLER'S MENU PARAMETERS' SET (Par. 3.5)
System's configuration
Alarm thermostat
Probe's type: '0' =10K blue; '1' 100K grey
Activation output's AUX (6-7) protection functions
Parameters USER'S MENU (Par. 5.0)
Starting threshold pump1
Differential thermostat Probe1 - Probe2
Thermostat hysteresis parameter A01
Thermostat hysteresis parameter A03
GAS BOILER
B
Gas
mural
thermic
group
S2
3 exits
V1
valve
BOILER
System's symbol
15 - 16
13 - 14
17 - 18
6 - 7
Description
Description
Cod. 004770370

HEATING SYSTEM

HSo
SANITARY
HOT
WATER
HSi
Sanitary
cold
water
D
distribution
system
S1
P1
S2
1 2 3 4 5 6 7 8 9 10 11 12 13 14
V1
U.
Min Default
n
C01
°C
n
n
U.
Min
°C
°K
°K
°K
SOLAR
CONFIGURATION
C06
20 19 18 17 16 15
Max
C06
C08
60
85
90
0
0
1
0
0
1
Default
Max
20
50
70
0
4
20
0
2
5
2
0
5
TC120

Publicidad

Tabla de contenido
loading

Tabla de contenido