Installation; Water Connection - Electrolux FIT2B Manual De Instalación, Funcionamiento Y Mantenimiento

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

E N G L I S H
Capitolo 4 dfdgdhh

INSTALLATION

PACKING
The machine is packed into a special export
cartoon (INDUPACK) fixed on a fumigated
pallet.
TRANSPORT
Upon receipt of the machine packed, you are
kindly requested to immediately report to the
forwarding agent any damage suffered by the
packing during the transport.
In case of damages to the machine as well, the
insurance company of the forwarding agent will
be held responsible only if these damages have
been reported immediately.
All the installation operations must be undertaken
only by competent personnel equipped with the
necessary protection. Do not use water jets
against the machine for any reason and avoid
sudden movement or violent blows.
Do not carry the machine by hand, but only by
forklift truck or tackle.
It is advisable to move the machine complete with
the packing to where it is to be installed and then
unpack the machine.
UNPACKING OF THE MACHINE
Proceed as following:
a) Remove the cabinet or crate by using proper
tools.
b) Remove the plastic protection.
c) Verify that the machine has not suffered
damages during the transport.
d) Take away from the pallet all the accessories
not fixed or bolted, as they can damage
property, persons or animals when falling
down.
C H A P T E R 4
e) Remove the bolts fixing the machine to the
pallet
f)
Sling the machine by means of two ropes
(verify that are suitable for the total weight
of the machine), one at the rear and the
other at the front side of machine; then lift it
by means of forklift truck or tackle and place
it where it must be installed, without moving
it by hand.
g) When
carefully refit all the panels, protection devices
and the accessories.
Various distances from the walls and other
equipment
installation of the machine in order to ensure
smooth operation and good maintenance.
The equipment does not require any fixing to the
floor.
It is recommended that the equipment should be
installed dead level.

WATER CONNECTION

(SEE DRAWING PAGE 10-3)
Fit a 3/8" zinc-platted gas pipe to within 100 cm of
the machine.
Fit a ball valve with tube connector to the end of
the tube, and connect it by a rubber hose (Øint 13
mm) suited to the mains water pressure to the
water input "POS. 14".
In the case of the boiler being feed from a water
tank, request the manufacture for information
regarding the modifications to be made to the
pump.
Connect the drainage gate valve to the drain using
a rigid heat-insulated pipe.
In the case of there not being a drain near by, or
the drainage of hot water not being allowed, use
a 15-20 litre tank to collect the boiler waste water
(the water can then be disposed of when it has
cooled).
N.B.:
if
contamination of the water mains so require,
install a water feed tank or one-way flow device
to prevent the back-flow of possibly polluted
water to the water mains (for example, a
GIACOMINI R 624).
Page 4-1
installation
has
been
must
be
observed
local
regulations
regarding
E N G L I S H
completed,
during
the
the

Publicidad

Tabla de contenido
loading

Tabla de contenido