Test Run; Before Test Run - AUX NFH Serie Manual De Instalación Y Usuario

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

TEST RUN

Before Test Run

Only perform test run after you have completed
the following steps:
Electrical Safety Checks – Confirm that
the unit' s electrical system is safe and
operating properly
Gas Leak Checks – Check all flare nut
connections and confirm that the system is
not leaking
Confirm that gas and liquid (high and low
pressure) valves are fully open
Test Run Instructions
You should perform the Test Run for at least 30
minutes.
1. Connect power to the unit.
2. Press the ON/OFF button on the remote
controller to turn it on.
3. Press the MODE button to scroll through the
following functions, one at a time:
COOL – Select lowest possible temperature
HEAT – Select highest possible temperature
4. Let each function run for 5 minutes, and
perform the following checks:
This unit must be installed by a professional according RD 795/2010, RD 1027/2007 and RD 238/213
List of Checks to Perform
No electrical leakage
Unit is properly grounded
All electrical terminals
properly covered
Indoor and outdoor units
are solidly installed
All pipe connection
points do not leak
Water drains properly
from drain hose
All piping is properly
insulated
Unit performs COOL
function properly
Unit performs HEAT
function properly
Indoor unit louvers
rotate properly
Indoor unit responds to
remote controller
100
9
PASS/FAIL

Publicidad

Tabla de contenido
loading

Productos relacionados para AUX NFH Serie

Este manual también es adecuado para:

Asw-nfh serieYkr-hAsw-nfh 09Asw-nfh 12Asw-nfh 18Asw-nfh 24

Tabla de contenido