Installation To Wood Joist Ceilings - PRG UNV Manual De Instalación, Funcionamiento Y Servicio

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation To Wood Joist Ceilings

• Installer must verify that the supporting surface will safely support the combined load of the equipment and all attached
hardware and components.
• Tighten wood screws so that projector mount assembly is firmly attached, but do not overtighten. Overtightening can
damage the screws, greatly reducing their holding power.
• Never tighten in excess of 80 in. • lb (9 N.M.).
• Make sure that mounting screws are anchored into the center of the stud. The use of an "edge to edge" stud finder is
highly recommended.
• Hardware provided is for attachment of mount through standard thickness drywall or plaster into wood studs. Installers
are responsible to provide hardware for other types of mounting situations (not UL approved).
2
Place projector mount assembly (A) on ceiling as a template and mark the center of the two mounting holes. Make
sure that the mounting holes are in the center of the wood joist. Drill two 5/32" (4 mm) dia. holes to a minimum
depth of 2.5" (64 mm). Attach projector mount assembly (A) with two #14 x 2.5" (6 mm x 65 mm) wood screws (D)
and two flat washers (F) as shown in figure 2.1 or figure 2.2 depending on joist orientation.
Note: Mounting slots on projector mount assembly allow for 30° (±15°) of rotation before fully securing wood screws.
Tighten wood screws (D) using 3/8" (10 mm) socket wrench, phillips screwdriver or 10mm open end wrench until
projector mount assembly (A) is firmly attached.
Skip to step 5.
A
F
D
fig. 2.1
WARNING
ACCESS SLOT FOR
OPEN END WRENCH
ALLOWS TIGHTENING
WOOD JOIST
OF WOOD SCREW (D).
ARROW ON TOP OF
PROJECTOR MOUNT
ASSEMBLY INDICATES
FRONT OF MOUNT
WOOD JOIST
A
F
D
fig. 2.2
ARROW ON TOP OF
PROJECTOR MOUNT
ASSEMBLY INDICATES
FRONT OF MOUNT

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Unv-sUnv-w

Tabla de contenido