WARNING: Test all gas piping
and connections for leaks after
installing or servicing. Correct
all leaks at once.
PRESSURE TESTING GAS SUPPLY PIPING SYSTEM
Test Pressures In Excess Of 1/2 PSIG (3.5 kPa)
1. Disconnect heater with its appliance main
gas valve (control valve) and equipment
shutoff valve from gas supply piping sys-
tem. Pressures in excess of 1/2 PSIG will
damage heater regulator.
2. Cap off open end of gas pipe where equip-
ment shutoff valve was connected.
3. Pressurize supply piping system by either
using compressed air or opening gas sup-
ply valve.
Test Pressures Equal To or Less Than 1/2 PSIG (3.5 kPa)
1. Close equipment shutoff valve (see Figure 18).
2. Pressurize supply piping system by either
using compressed air or opening gas sup-
ply valve.
3. Check all joints from gas supply (see Fig-
ure 19 or 20) to equipment shutoff valve.
Apply a noncorrosive leak detection fluid
to all joints. Bubbles forming show a leak.
4. Correct all leaks at once.
Propane/LP
Supply Tank
Figure 19 - Checking Gas Joints for
Propane/LP Gas
PRESSURE TESTING HEATER GAS CONNECTIONS
1. Open equipment shutoff valve (see Figure 18).
2. Open gas supply tank valve.
3. Make sure control knob of heater is in the
OFF position.
4. Check all joints from equipment shutoff
valve to control valve (see Figure 19 or 20).
Apply a noncorrosive leak detection fluid
200130-01C
INSTALLATION
CHECKING GAS CONNECTIONS
Gas Valve
Equipment
Shutoff Valve
www.usaprocom.com
WARNING: Never use an open
flame to check for a leak. Apply a
mixture of liquid soap and water
to all joints. If bubbles form, there
is a leak. Correct all leaks at once.
4. Check all joints of gas supply piping
system. Apply mixture of liquid soap and
water to gas joints. If bubbles form, there
may be a leak.
5. Correct all leaks at once.
6. Reconnect heater and equipment shutoff
valve to gas supply. Check reconnected
fittings for leaks.
Equipment
Shutoff Valve
Figure 18 - Equipment Shutoff Valve
Gas Meter
Figure 20 - Checking Gas Joints for
Natural Gas
to all joints. Bubbles forming show a leak.
5. Correct all leaks at once.
6. Light heater (see Lighting Instructions on
page 18). Check all other internal joints
for leaks.
7. Turn off heater (see To Turn Off Gas Ap-
pliance, page 19).
Open
Closed
Gas Valve
Equipment Shutoff Valve
17

Publicidad

Capítulos

Tabla de contenido

Solución de problemas

loading

Productos relacionados para Cedar Ridge MD10TBU

Este manual también es adecuado para:

Md20tbuMd30tbu

Tabla de contenido