Electrical Connection; Start Up; Maintenance; Instructions - S&P VMC AKOR ST HR Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

5. ELECTRICAL CONNECTION

Before any operation, disconnect
power at the main circuit breaker
and
ensure
that
unintentionally turn it on again.
The
electrical
connection
completed according to the diagram
shown opposite:
Plan for:
-
An all-pole switch with a contact
opening distance of at least 3 mm
-
An 2A circuit breaker on the General
Distribution
Panel
Safety.
Use cable of 1.5 mm
sheath diameter 16mm.
To access the terminal block of each fan
unit, open the electrical hatch using a
screwdriver (4 mm) as shown opposite :

6. START UP

Before starting the equipment after installation, ensure that both fans turn freely and that there is no foreign
body (such as pieces of insulation, etc.) that may block the rotation of the turbine.
Check that the ducts were not crushed during installation: crushed ducting dramatically reduces ventilation
rates and performance.
Ensure the condensate drain is connected properly and that the pipe is insulated to prevent freezing.

7. MAINTENANCE

7.1 Instructions

7.1.1
Extraction and air output nozzles
Clean the bathroom and kitchen exhaust vents with warm water and soap.
Remove dust from the air output vents in the main rooms.
ENGLISH
no
one
can
must
be
for
Electrical
2
section and the
Alimentation MONO 230V 50Hz + Ground
L N
Switch
18 / 40
Blowing fan
V/J
Blue
N
Brown
SS
HS
Black
Exhaust fan
V/J
N
Blue
SS
Brown
HS
Black
NT_51895501_AKOR ST HR-AN_140325.docx

Publicidad

Tabla de contenido
loading

Tabla de contenido