Alarm Signals - Diagnostics; Wiring; Maintenance And Repairs; Routine Maintenance - Zanotti FZ Serie Manual De Uso Y Manutención

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

7.4
Alarm signals
In case of probe faulty the signal "E1." will be displayed . In this condition the unit will be functionning as
follow:
15 minutes normal running followed by 30 minutes stop. This till the substitution of the probe.
8.

Wiring

A wiring diagram, specific for the units of the FZ series, is enclosed with these use and maintenance
instructions.
9.

Maintenance and repairs

Suitable maintenance is crucial for obtaining longer life, perfect working conditions and high efficiency of the
unit as well as for ensuring the safety features provided by the manufacturer.
10.

Routine maintenance

Few operations, listed below, are required in order to ensure long life and reliable use of the units
VIsually check (by using the gauge) Ihe exact amount of refrigerant: If
necessary, identify any gas leaksin the refrigerator circuit:
Check correct operation of the system devices (thermostat, pressure switch,
etc)and control devices (contactors, relays,fuses, etc).
Check the correct tightness and allignment of the various components of the
bracketing of the compressor.
Check the state of wear and the tension of the compressor belt
Check proper operation of the evaporator and condenser fans
Check proper operation of the defrosting system (wheter automatic or
manual).
Check the operation of the belt-tightener
Check the fixing and good state of repair of electrical cables and piping
Check proper operation of the electromagnetic clutch
Check the level of oil in the compressor
RECOMMENDED MAINTENANCE TO BE CARRIED OUT ONE YEAR FROM THE DATE OF THE FIRST INSTALLATION;
Clean the finned area of the condenser with a compressed air jet.
Replace the bearings In the tlghteners if they are noisy.
Check the brushes (carbon) of the fans and clean the manifold
Replace Ihe compressor belt if it is too worn
W ARNI NG
Use safety gloves to protect your hands from possible cuts.
W ARNI NG
Disconnect the unit before w orking on it.
CHECKS TO BE MADE
50 hours
500 hours
or 15 days
or 5
months
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
1000 hours
or 10
months
X
X
X
X
X
X
X
31

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Fz007Fz008Fz009

Tabla de contenido