2. MECHANICAL INSTALLATION
The current measurement unit can be installed in any position.
The UMC´s 1, 2, 3 and 4 can be mounted directly on a
35 mm (1.38 in) DIN rail or fixed by means of M4 screws,
using the screw fixing adapter.
The UMC´s 5 and 6 present only the M4 screw mounting
possibility.
3. ELECTRICAL INSTALLATION
The current measurement unit is connected to the Control Unit
through a ribbon cable.
The ribbon cable for the connection of the UMC to the relay
can be acquired in the following models:
120 mm (4.72 in) UMC connection cable
500 mm (19.68 in) UMC connection cable
1000 mm (39.37 in) UMC connection cable
2000 mm (78.74 in) UMC connection cable
ATTENTION!
The current measurement unit (UMC) can be
installed up to 2 m distant from the control unit (UC).
4
Table 1: UMC connection cables
UMC Connection Cables
Description
Model
SRW01-CB1
SRW01-CB2
SRW01-CB4
SRW01-CB3