Descargar Imprimir esta página

Installing The Sv-3 Storage Tank Transfer Set; Scope Of Delivery - Solvis SV-3 Manual De Instrucciones

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 8
EN 1 Installing the SV-3 Storage Tank Transfer Set

1 Installing the SV-3 Storage Tank Transfer Set

1.1
Notes
Observe the safety notes
This is for your own safety.
• Make sure that you are familiar with the safety
notes before beginning work.
• Observe and adhere to the relevant safety regu-
lations and the valid accident prevention regu-
lations.
• You should also follow the safety notes and any
other notes from the available system docu-
mentation.
Space requirement
An area measuring approx. 1 m x 0.5 m is needed for
installation, to include the on-site piping.
FS
1
SR-xxx
3
5
7
9
S7
11
Fig. 7: Scheme of the Storage Tank Transfer Set
ES
Following buffer tank
SPUM
Storage Tank Transfer Set
1
Connection according to diagram for P38

1.2 Scope of Delivery

• 1 x Wilo-Yonos PARA 15/7 RKC circulation pump
• 1 x insulation shell for pump
• 1 x Esbe VRG142 4-way mixer
• 2 x 40 mbar spring-loaded gravity brakes
• 2 x ball valves
• 1 x 20 mbar spring-loaded gravity brake
• 2 x ¾" gaskets
• 1 x Esbe ARA645 2-point actuator drive
• 1 x TSB adjusting valve with bypass, 10-40 l/min
• 1 x storage tank temperature sensor (S7)
4
1
2
4
6
8
10
12
A24
A20
SPUM
Functional description
The SV-3 storage tank transfer set is used to connect an
additional SolvisStrato stratified buffer tank as a follo-
wing buffer tank (ES) to an existing SolvisStrato as the
leading buffer tank (FS) in the SolvisVital 3 system. You
can use a motorised four-way switching valve to charge
from the leading buffer tank to the following buffer tank,
or vice versa. When you install the system, pay attention
to the position and installation direction of the non-
return valve (RV) (spring-loaded gravity brakes), see
Fig. 7.
V
M
A22
FS
Leading buffer tank
SR-xxx
SolvisStrato stratified solar storage tank
Adjusting valve
V
1.3 Installation
Laying the piping
1. Connect the pump (6) to the 20 mbar gravity brake
(5), the ball valves (4), the adjusting valve (3) and the
4-way mixer (1) as shown. In the process, make the
on-site pipe connection (2) between the adjusting
valve and the 4-way mixer.
2. Lay pipes from the 4-way mixer and the gravity bra-
kes (7) to the storage tanks according to the system
diagram (see
Speicherumladesatz SV-3 · Technische Änderungen vorbehalten 10.14 · P23-M SOLVIS
ES
SR-xxx
1
S26
2
3
4
5
6
7
8
10
9
11
12
S25
Fig. 7).

Publicidad

loading

Este manual también es adecuado para:

24666