Connector Pin Assignment; Temperature Sensors; Flow Sensor - Zenner EnergieTechnik multidata WR3 Manual De Instalacion Y Uso

Ocultar thumbs Ver también para EnergieTechnik multidata WR3:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

Español
Italiano

Connector pin assignment

Temperature sensors

2-wire measurement:
Supply
1 – 2
Return
3 – 4

Flow sensor

pulse:
10
GND:
11
Input/Output
I/O 1:
pulse:
GND:
M-Bus
L1: 24
L2: 25
can differ. If water meters with a potential free reed contact are con-
nected to the inputs the connection can be made in any direction. Take
care of the polarity when connecting to a BMS. The connectors 24/25
2 4
Switch
Connection 2-wire
Connection 4-wire
4-wire measurement (optionally):
Supply
Return
I/O 2:
52
53
RS-232
DTR: 71
GND: 72
1
2
3
4
1 – 2 / 5 – 6
3 – 4 / 7 – 8
pulse:
54
GND:
55
RS-485
+UB: 71
GND: 72
A: 73
B: 74
10 11
9 50 51 52 53 54 55
71 72 73 74
19

Publicidad

Tabla de contenido
loading

Tabla de contenido