9. INSTALATION AND OPERATION.
Note: Please install the machine strictly according to the following steps.
Turn off the power supply switch before any electric connection operation.
The housing protection grade of this machine is IP21S, so do not use it in rain.
Connect the power input terminal (AC230V INPUT) on the back panel of the machine to
provisions of the Voltage and with a power cord of appropriate specification throng a
fuse with a capacity of 40A or more.
Locate the welding source near the socket, and keep it well ventilated.
To ensure
than 250mm.
Please protect the circuit with delay fuse of corresponding specifications to
ensure normal work.
Grounding requirements:
In order to ensure normal work and personal safety and reduce the EMI, the
welding source should be grounded reliably.
9.1 Instalation method
A primary power supply cable is available for this welding machine. Connect the power
1)
supply cable to the rated input power.
The primary cable should be tightly connected to the correct socket to avoid oxidization.
2)
Check whether the voltage value varies in acceptable range with a multi-meter.
3)
Insert the cable plug with electrode holder into the "+" socket on the front panel of the
4)
SMART 160 PFC
good dissipation, the space around the welding source should not be less
Pag. 27