Haier GE USYF09UCDWA Instrucciones De Instalación página 7

Ocultar thumbs Ver también para GE USYF09UCDWA:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation Instructions
Console Installation
Step 4: Piping Bundle Hole
A. Determine Hole Position
1. Determine the hole position based on desired piping
configuration.
2 1/2" (65)
5/8" (16)
4 1/2" (115)
For Right or Left Side Piping
3-4/15 (83)
B. Drill Hole
1. Drill a 2-3/8" downward-pitched hole for the
refrigerant line/condensate drain/wiring bundle.
2. Once bundle is installed, seal the hole.
Wall hole
55mm
Indoor side
(Section of wall hole)
31-5000496 Rev. 1
Bottom View
5 3/4" (147)
2 3/4"
(70)
3/4" (19)
3 1/4" (83)
3-4/15 (83)
Outdoor side
Thickness of wall
Piping hole pipe
G
Console Installation
Step 5. Piping Configuration and
Installation
A. Piping Configuration
Rear Piping: NOTE: Rear piping may exit at any
position at the back of the unit.
Route the line set and drain hose through the rear
opening.
Left & Rear-Left Piping: When routing left or rear-left
piping, carefully bend the line set and drain hose to
keep flush with the piping cavity in the rear of the unit.
Removed the left side knock-out if routing out of the left
side.
Other: Remove the appropriate piping knockout (if
required) according to the desired piping direction, and
carefully route the piping to the wall hole.
Left Rear
Left
Below Left
Right
Rear
Right
Below Right
7

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Ge usyf12ucdwaGe usyf18ucdwa

Tabla de contenido