Dimensional Data - Fantech DBF 110 Manual De Instalación Y Mantenimiento

Ocultar thumbs Ver también para DBF 110:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

4

Dimensional Data

A
B
3 31 /
4 31 /
DBF 110
32
Dimensions are in inches.
Illustration 1
Alternative Location
Secondary Lint Trap
12-o-clock
10-o-clock
D
C
D
E
12 3 /
11 1 /
9 3 /
32
4
4
4
Switch
DBF110
2-o-clock
Installation Guidelines
Fan and Switch Mounting
The DBF110 is to be mounted a minimum of 15 linear (not equivalent)
feet from the dryer outlet. A secondary lint trap (DBLT 4W) is recom-
mended if the fan is installed between 5 and 15 linear (not equivalent)
feet from the dryer outlet in applications, where excessive dryer lint gen-
eration is likely or to increase the time interval between routine mainte-
nance of the Dryer Booster Fan (See illustration to left). An NB mounting
bracket attached to a rafter or joist should be used to stabilize the fan.
Although not recommended, a vertical rigid duct may support the fan if
the duct is securely stabilized. (Consult local codes prior to supporting
the fan in the duct alone.) Duct work should be attached to the inlet and
outlet of the fan by means of FC vibration isolation clamps (not included)
or duct tape. The duct connection should be properly sealed to prevent
leakage and loss of fan performance. Flex duct connections between the
dryer duct connection and exhaust duct should be stretched as smooth
as possible.
Calculating Duct Run
To calculate the length of your planned duct run, measure from the dryer
F
to external venting point in roof or wall. For each bend or elbow add 5-7
10
feet to your total duct run calculations. The DBF110 can be used on runs
up to 108 feet.
Pressure Sensor Switch Operation
Fantech's DBF110 is equipped with Fantech's Patented DB10 pressure
switch. The DB10 is a positive pressure sensing switch which
recognizes dryer operation and activates the booster fan from an
independent electrical circuit. This eliminates connections through the
dryer circuit which may void the manufacturers' warranty as well as
manual systems which require the attention of the operator or costly
current/temperature sensing systems.
The electricity to the booster fan is connected in series through a
normally open terminal on the switch. A pressure tap is connected to a
fitting on the side of the switch. When the dryer begins operation,
positive pressure in the duct causes the switch diaphragm to expand,
closing the circuit to the booster fan. An integral delay-on-break timer in
the switch will cycle the fan on for intervals of 10 minutes. This will con-
tinue until the dryer has stopped and the timer delay period has lapsed.
Drying cycles, the booster fan, the delay timer and the pressure switch
are not adversely affected by the starting/stopping intervals.
Sensitivity Adjustment Instruction
a. Disconnect power to the booster fan.
b. Looking from the inlet (dryer side), the switch should be at the
12-o-clock position.
c. Remove the 2 mounting screws holding the switch to the fan.
d. Rotate the switch to the 10-o-clock position for less sensitivity or
2-o-clock position for more sensitivity then secure it there, you may
have to adjust (bend) the bracket to fit. Secure the switch with the
2 screws previously removed.
e. Apply power to the fan and check for operation.

Publicidad

Tabla de contenido
loading

Tabla de contenido