Fig.15: Lift the Base protector (B4), attach the post base (A4) to the post (C4) with bolt (DD) & washer (BB).
Fig.16: Fix the top block (D4) to the post (C4) with bolt (CC) & washer (BB). (Note: the screw holes on the post
and the screw holes which install the block plate (E4) should be in the same direction as shown on
drawing.)
Fig.17: Lift the assembled pavilion roof and fix the assembled post to the corner of the roof with bolt (CC) &
washer (BB). (Note: The screw holes on the post must be directed inward. 6 people are needed here.)
Fig.18: Fix the Corner connector (G1) to the top block (D4) with bolt (CC) & washer (BB).
Fig.19: Fix the block plate (E4) to the top block (D4) with bolt (DD) & washer (BB).
Fig.20: Fix the arc support bar (F4/G4) to the post (C4) & decorative beam with bolt (CC) & washer (BB).
Fig.21: Fix the gazebo on the grass ground with the peg (HH).
Fig.21-1: Fix the gazebo on the cement ground with the anchor (II).