7.
Place the upper shell with the scum wall on top of
the lower shell. Assemble the clamps for con-
necting the upper and lower shells.
9.
2700 L
3750 L
145 mm
145 mm
Drill the inflow and outflow with a DN 100 core
drill (with a diameter of 124 mm).
11.
Slide the outflow pipe through the outflow hole
from the inside.
4. Assembling the set-up kit
H
H
4800 L
6500 L
190 mm
205 mm
Assemble the clamps for connecting the upper and
lower shells.
De-burr the hole. Insert the DN 100 lip seal. In the
case of the outflow, the direction of the feed-
through must be from the inside out. Affix the "Out-
flow" sticker.
The jack base must be turned depending on the
tank size. The specified tank size on the base must
be the same as on the jack.
17 / 33
8.
10.
12.