Information On This Document; Validity; Target Group; Symbols - SMA RoofCommKit-P2-US Instrucciones De Instalación

Ocultar thumbs Ver también para RoofCommKit-P2-US:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

SMA Solar Technology America LLC
1

Information on this Document

1.1

Validity

This document describes the assembly and installation of approved accessories in SMA inverters.
This document supplements the documents that are enclosed with each inverter and does not
replace any locally applicable codes or standards. Read and observe all documents supplied with
the inverter.
This document applies to the SMA Rooftop Communication Kit (RoofCommKit-P2-US).
1.2

Target Group

The tasks described in this document must only be performed by qualified persons. Qualified
persons must have the following skills:
• Knowledge of how an inverter works and is operated
• Training in how to deal with the dangers and risks associated with installing and using
electrical devices and installations
• Training in the installation and commissioning of electrical devices and installations
• Knowledge of the applicable standards and directives
• Knowledge of and compliance with this document and all safety information
1.3

Symbols

Symbol
1.4

Typographies

Typography
bold
>
[Button]
Installation manual
Explanation
Information that is important for a specific topic or goal, but is not
safety-relevant
Indicates a requirement for meeting a specific goal
Desired result
A problem that might occur
Use
• Terminals
• Slots
• Parameters
• Elements on the user interface
• Elements to be selected
• Elements to be entered
• Connects several elements to be
selected
• Button to be selected or pressed
1 Information on this Document
Example
• The value can be found in
the field Energy.
• Select Settings.
• Enter 10 in the field
Minutes.
• Select Settings > Date.
• Select [Next].
RoofCommKit-P2-US-IA-xx-10
7

Publicidad

Tabla de contenido
loading

Tabla de contenido