Descargar Imprimir esta página

Cillit PIONEER Instrucciones De Instalación Y Funcionamiento página 10

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

GB
I. Unpacking the device:
Remove the device from its packaging and check
the delivery to see that everything is there and for
any damage caused during transport.
II. Flow direction
Please note the desired flow direction prior to
assembly. The device comes as standard with a
flow direction "from left to right". If you need to
change the flow direction, then proceed as
follows:
a. Remove the device cladding after releasing
the two locking screws (knurled screws) on
the side of the device (see Fig. 1 und 2).
b. Set the device down with its back facing up
on a soft base (see Fig. 3).
c. Release the assembly bracket and remove it
(see Fig. 4).
d. To release the connector, press the circlip on
both flaps together and pull it in the direction
of the connection (see Fig. 5).
e. Turn the connection 45° anticlockwise and
remove it (see Fig. 6).
f.
Turn the base in the flow direction and re-
connect it to the device (see Fig. 7, 8, 9).
g. In so doing, please note the flow direction
arrows and make sure the circlip clicks in. If
the PIONEER is to be fitted in a vertical pipe,
only turn the connector 45°. Then this is fitted
again and secured.
h. Then fit the support bracket back to its
original position.
III. Connecting to the water pipe
Connect the device using the screw connection
supplied to the pipe, and using the fastening
bracket, screws and dowels supplied, to the wall.
The projection of the tubular axle in PIONEER may
be between 80 mm and 100 mm. The minimum
ground clearance of the tubular axle or the assem-
bly point in vertical pipes is 500 mm. After prepa-
ring the pipe, fit the wall bracket and set the devi-
ce on the wall bracket. The two screws connect
your PIONEER lime scale protection device to the
wall bracket (see Fig. 10 and 11).
5. Start-up
After the installation or after changing the lime-
scale protection unit, open the shut-off valve in
front of the PIONEER lime scale protection system
and pressurize the device. Then check that all
connections are properly sealed.
10
Important!
Cillit PIONEER and the integrated lime scale
protection unit are supplied dry for hygienic rea-
sons. For this reason, we recommend thoroughly
rinsing the device on start-up by opening a drain
valve for approx. three minutes. This also allows
any shavings and other impurities introduced on
installation to be rinsed out.
Then put the mains cable into the protective
contact socket provided and check that the two
green indicator LEDs are working in the inspection
window. Both indicator lamps must light up.
When water is removed, the upper indicator LED
starts to flash every two seconds. If this signal is
not displayed, then check the flow
power supply and the cable con-nections.
The device is now ready for use!
6. Operation
PIONEER displays all operating conditions
through the two indicator LEDs in the inspection
window (see Fig. 12). When water is removed, the
upper indicator lamp flashes every two seconds. If
the indicator LED "IN OPERATION" goes out, then
the lime-scale protection unit, as described in
Item 7, must be changed. If the indicator lamp
"POWER" goes out, there is either a fault in the
power supply or the device has been seriously
damaged. If the indicator lamp "POWER" does
not flash when water is removed, then the water is
not removed by the device or there is a fault in the
device. In this case, please contact your fitter or
your technical advisor of Cillit.
POWER
Stand-By
(both LEDs
up)
Stand-By, Replace
limescale protection
unit
Water removal
(POWER flashes)
Water removal,
remove limescale
protection unit
No power supply
or electrical
fault
direction, the
IN OPERATION
(( ))
(( ))

Publicidad

loading