AquaPRO 35014-4 El Manual Del Propietario página 5

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

7. Try to assemble the system (no glue). Insert a piece of PVC pipe into the tee and insert another piece of
PVC pipe into the 1-1/4" adaptor. Plug the rubber hose on the PVC pipe. Connect the tee with the primary
sump and verify the assembly in the sump pit.
If necessary adjust the PVC pipe length in the rubber hose so that nothing interferes with the primary pump
and switches.
8. Recheck the alignment and glue all the joints.
9. After the glue has set. Slid the hose clamps to rubber hose tighten the clamps.
10. Hook the DC pump switch clamp over the switch mounting bracket. Adjust the switch assembly location
along the discharge pipe so that the DC pump float lower point is above the primary pump "ON" position.
Tighten the mounting clamp of the DC pump switch.
Battery and control box wiring and set-up
1. Properly set up the battery in the control box. Connect the leads from controller Red+ to battery Red+;
Black- to battery Black-.
Note: Be sure the battery box ventilation holes are unobstructed. Battery control box must be set up in a
well-ventilated area. Smoking and open flames are prohibited.
2. Plug the pump wire male terminal into the female terminal "PUMP" on the control box.
Plug the float switch male terminal into the female terminal "FLOAT" on the control box.
3.
4. Plug the 12Volts transformer outlet plug into the power connector "POWER" on the control box. Plug the
transformer into a 115Volts GFCI power outlet. The LED indicators on the control box screen should be
"ON".
5. Follow the on-screen instruction. Test the pump operation by lifting and holding the float. The "Pump
Status" LED will continuously light and the buzzer will beep steadily. The pump should start. If the pump
doesn't run, check all the connections and reconnect them as necessary.
5

Publicidad

Tabla de contenido

Solución de problemas

loading

Tabla de contenido