Descargar Imprimir esta página

Wolf 20 71 729 Instrucciones De Montaje página 3

Conexiones hidraúlicas interacumulador vertica

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 7
flow
Fig 1: pipework kit for vertical calorifier
Survey of connection kits with coordination to boiler or calorifier types:
The length of the hose is sufficient for a distance of 80 mm between boiler and calorifier in case of side-by-side arrangement
and the following combinations.
Art.-No.
calorifier type
Scope of supply:
• 2 corrugated stainless steel hoses DN25, length 1,5 m,
insulated, with threaded connection1" on both sides
• 1 bend 90° insulated with threaded connection 1" on both
sides
• 1 High efficiency pump (EEI < 0,23) with cable,
completely wired with plug
• 3 reductions 1½"IG / 1"AG
• 2 double nipples 1"AG
• 2 seals EPDM 1 ½" for threaded connections of the pump
• 2 seals AFM 1 ½"
• 6 seals AFM 1"
• 1 corner piece with ventilation and convertible gravity brake
3063379_201301
Installation instructions
Pipework kit for vertical calorifier
vertical calorifier
CNK
CHK
20 71 729
SE-2 up to 750 or SEM-1/2 up to 750
boiler
FNG 10 - 41
additional advice for the pump:
• pump shut-off devices are available as accessories
(2 x Art.-No. 20 12 058)
return
FNG 57
20 71 729
SE-2 bis 500
3

Publicidad

loading