ENGLISH
OVERHEAD RIGGING
You can use the M10 thread on the top of the DS12 box to fix a rigging hook.
Important: The installation must be carried out by qualified service personal only. Improper
installation can result in serious injuries and/or damage to property. Overhead rigging requires
extensive experience! Working load limits should be respected, certified installation materials
should be used, the installed device should be inspected regularly for safety.
Make sure the area below the installation place is free from unwanted persons during rigging, de-rigging
and servicing.
The device should be installed out of reach of people and outside areas where persons may walk by or be
seated.
Before rigging make sure that the installation area can hold a minimum point load of 10times the device's
weight.
Always use a certified safety cable that can hold 12times the weight of the device when installing the unit.
This secondary safety attachment should be installed in a way that no part of the installation can drop
more than 20cm if the main attachment fails.
The device should be well fixed; a free-swinging mounting is dangerous and may not be considered!
The operator has to make sure that the safety-relating and machine-technical installations are approved by
an expert before using them for the first time. The installations should be inspected every year by a skilled
person to be sure that safety is still optimal.
SPECIFICATIONS
Power Input:
Fuse:
Max. Total Output Power:
DMX input:
DMX outputs:
Size:
Weight:
You can download the latest version of this user manual on our website: www.beglec.com
BRITEQ
®
AC230V / 50Hz.
250V 10A slow blow (20mm glass)
Max.10A over both outputs together
3pin or 5pin XLR
3pin XLR
130 x 132 x 56mm
0,780kg
Every information is subject to change without prior notice
4/20
OPERATION MANUAL
DS12