1. Confirm that the valves
have been installed
properly.
See the TBN02201/TBN02202/
TBN02203/TBN02204 installation
manual for further information.
2. Orient handle assembly and lower onto the valve until engaged. Fasten
handle escutcheon to collar with provided set screw. Tighten with hex key
as needed.
3. Repeat for other handle assembly.
NOTE: If handles do not line up exactly as desired, remove
handle assembly from valve, take out the adjusting connector and
stagger the spline adjustment angle, which may need to be adjusted
several times to achieve desired orientation.
Close
Hand alignment
Adjusting connector
The adjusting connector
will fall off if pulled with force.
4. Remove plug cover from outlet.
5. Orient spout assembly as shown and lower onto exposed portion of
valve body. Fasten spout to valve body with provided set screw.
Tighten with hex key as needed.
INSTALLATION PROCEDURE
HOT
TBN02203 and TBN02204 ONLY
(4 Hole Roman Tub Filler Rough-in)
Spline
Disassembly
4
Collar
Plug cover
Collar
COLD
Stagger
Please insert the adjusting
connector rmly, and make
sure that the adjusting connector
is secure after insertion.
Collar
Insert