3. Use
Always install the Foamatic unit in frost-free rooms only.
The unit is delivered complete and ready for mounting on a wall or a suitable rack. The unit is mounted on the
enclosed wall bracket according to description in the installation guide. It is very important that all pipe connec-
tions are thoroughly rinsed before installation.
It is very important to use correct nozzle sizes where foam, desinfection or rinsing is carried out. E.g. the foam
volume produced by the injectors must comply with the nozzle volume. If the injectors produce 150 l/min, and
three valves for one zone are used, the amount of litres on the three valves must also be approx 150 l. If this is
not observed, the quality of the foam will not be satisfactory. – For further information do not hesitate to contact
Ecolabs service department.
4. Service
Only authorised and qualifi ed personnel is allowed to carry out service on the unit. Only carry out service when
the Foamatic unit is disconnected and depressurised.
1. Disconnect the power supply
2. Shut of the water supply
3. In order to depressurise the outlet side - open an external valve.
The unit is built in sections, which makes it possible to do service on a separate section. However, the Foamatic
unit is not operational without this section. One section for water and one section for each detergent.
4.1
Components
4.1.1 Master controller
Maintenance free.
In case of defects: please contact service technician.
4.1.2 ACC-01
Maintenance free.
In case of defects: exchange unit.
4.1.3 Non-return valve, water
Maintenance free.
I case of defects, exchange non-return valve.
4.1.4 Non-return valve, detergents
Maintenance free.
In case of defects, exchange non-return valve.
4.1.5 Non-return valve, air
Maintenance free
In case of defects, exchange non-return valve.