3 Installation
Wechsel ein-auf zweispaltig
Fig. 2: Mounting of stainless steel column
Wechsel ein-auf zweispaltig
For mounting, MENNEKES recommends threaded bolts
and nuts both made of stainless steel with a strength
class of at least 8.8. Use only threaded bolts and nuts
made of stainless steel to prevent corrosion.
A separate supply line should be provided for each
AMTRON® charging station.
Create bedplate using six threaded bolts M10
A
accordance with the measurements shown on Page
"Information on the prefabricated bedplate" on page 5.
Cable length from top edge of bedplate approx. 2.5 m!
Alternatively, a prefabricated bedplate can be purchased
directly. Please refer to Page
<dg_ref_source_iline>Bestellinfos
Fundament</dg_ref_source_inline>.
Wechsel ein-auf zweispaltig
2
Remove bolts
B
insert for this purpose. Slide cover
Set the stainless steel column on the bedplate. Feed
C
connection cable
out of the uppermost cable outlet of the stainless steel
column.
Bolt stainless steel column down using six VA nuts M10
D
in
1
and tighten using a torque wrench (tightening torque
depends on selected threaded bolt size).
If necessary, integrate the stainless steel column into the
equipotential bonding / earthing system. A connection
point is provided on the stainless steel column's base
plate for this purpose.
"Information on the prefabricated bedplate" on page 5
on the base plate; use the supplied bit
2
upwards.
3
into the stainless steel column and
4