Descargar Imprimir esta página

Cooper Lighting Corelite Jaylum Instrucciones De Instalación página 3

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation Instructions – Jaylum Suspended LED Luminaire
Joining
Install first fixture with two AC cable assemblies, then
second fixture with one additional cable. (Figure 7 .)
Figurt 7.
Bend out tapered aligning tabs and fit into aligner slots.
(Fixture 2 is now supported by fixture 1 at the joint.) Make
electrical connections. (Figure 8.)
Figurt 8.
Tuck wires into wire cavity, slide both fixtures together.
Secure fixtures using two 10-32 x 3/8" screws and nuts.
Tighten 1/4 turn past hand-tight. (Figure 9.)
Figurt 9.
InsoallaoiNn InsorucoiNns – Jaylum Susptndtd LED Luminairt
ADE141250
www.cooperlighting.com
End Cap
End Caps: Slide into end of fixture and secure with two
10-32 x 3/8" self tapping screws. (Figure 10.)
Figurt 10.
LED Downlight Kit
LED DOWNLIGHT KIT: If downlight kit was removed during
installation (not required), re-install using included hardware
(four 10-32 x 3/8" screws). (Figure 11.)
Figurt 11.
Wiring
BLACK = LINE
WHITE = NEUTRAL
GREEN = GROUND
PURPLE = DIM +
GRAY = DIM -
Figurt 12.
BLACK = LINE
WHITE = NEUTRAL
GREEN = GROUND
PURPLE = DIM +
GRAY = DIM -
PURPLE STRIPED = CCT +
GRAY STRIPED = CCT -
Figurt 13.
RED = LED +
LED
LOAD
BLUE = LED -
STANDARD
DRIVER
0-10V
RED = LED +
LED
LOAD
BLUE = LED -
TUNABLE
RED/
WHT = LED +
WHITE
LED
DRIVER
LOAD
0-10V
BLUE/ = LED -
WHT
3

Publicidad

loading