Installation
CAUTION: The chronothermostat shall be installed by qualified
personnel only, in compliance with the current regulations in force.
Chronothermostat installation involves the following operations:
• Fastening the base.
• Electric connections.
• Fitting the batteries.
• Fastening the chronothermostats onto the base.
• Configuring chronothermostat parameters.
Fastening the base
The chronothermostat is supplied with a base suitable for wall mounting or for
flush-mounting in three-module rectangular or round boxes.
SPACING DIMENSIONS FOR FIXING THE BASE
Separate the base from the chronothermostat levering on the slot located at the
bottom of the base by means of a proper tool.
Make sure that the base is properly secured and it is not deformed. Check that
the chronothermostat multi-pole connector is placed at the bottom left corner.
To ensure correct operation the base shall be installed at about 1.5 metres above
the floor level and far from heat sources (heating radiators, direct sunlight, etc.),
doors and windows.
39
83
60
60
ENGLISH