3. Unpacking and Setup
This chapter provides unpacking and setup information for the Switch.
3.1 Package Contents
Unpack the package and check all the items carefully. If any item contained is
damaged or missing, please contact your local dealer as soon as possible. Also,
keep the box and packing materials in case you need to ship the unit in the future.
The package should contain the following items:
1 x NetMaster G16/24 Switch
1 x power cord
4 x Rubber footpads for Desk-mount
1 x Rack-mount kit for installing the switch in a 19-inch rack
1 x Quick Start Guide (English, Italian, French and Spanish)
1 x Warranty Card
1 x WEEE Disclaimer
3.2 Setup
The setup of the Switch can be performed using the following steps:
The surface must support at least 5 kg.
The power outlet should be within 1.82 meters (6 feet) of the device.
Visually inspect the power cord and see that it is secured fully to the AC power
connector.
Make sure that there is proper heat dissipation from and adequate ventilation
around the Switch. Do not place heavy objects on the Switch.
22