Descargar Imprimir esta página

Ecolab SM Serie Guía De La Instalación página 2

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

1. General information
For safety reasons it is important to read all of the enclosed information
( Installation guide, Service manual, Spare parts, Operating instructions)
before mounting this equipment.. In addition, the legislation in force at the
time of purchase must always be considered in connection with the installa-
tion and mounting of this equipment, no matter the contents of this manual.
If there are matters of dispute please contact your dealer.
This equipment is produced and tested by specially qualified personnel, fol-
lowing approved instructions to ensure our high level of product quality. After
the product is finished and tested it is manually inspected with the ultimate
test carried out just before the product is released for shipping. To obtain our
high level of quality and long life we use stainless steel parts. These parts, in
defiance of our manual inspections may still have some sharp edges, which
can present a cut hazard. Therefore it is advised always to use protective
gloves and show caution when installing the equipment.
2. Preparation
If the wall is made of bricks or concrete, the enclosed screws and rawl plugs
are usable otherwise you have to make sure that the carrying capacity of the
wall is sufficient.
Note: The pipeline must be rinsed through before the system is connected.
See service manual
Note: Remove cover before the system is mounted on the wall.
Note: The weight of the unit are listed in the Service manual under the
section "Specifications"
3. Placing/application
• Do not use the machine outdoors.
• The satellite must be placed in frost-free rooms only.
• Free space around the satellite: min 1000 mm.
4. Water supply
Water volume
1,2 - 2,5 MPa
Pressure
(12 - 25 bar)
Max. temperature
The supply line must be sized so that it can supply the minimum indicated
pressure and water volume when connected to this equipment. When dimen-
sioning the water supply, It is recommended to increase the available volume
with 15-20 % compared to the minimum requirements listed in the table.
Note: Recomented water hardness 14 - 18 dH°. The equipment will operate
with water hardness exciding this level however, descaling of pump system,
injectors and like must be expected depending on use pattern and water
quality. Futhermore, wear of the mechanical parts will increase as well. If not
supplied, filter should be mounted.
5. Air supply
Air supply for the system is to meet the following specifications:
• Pressure
6 – 10 bar
• Consumption
200 Nl/min.
SM3
SM-PD
30 l/min.
6 l/min.
0,5 - 1,0 MPa
(5 - 10 bar)
70
70
o
o
C
C
EN
6. Piping
The pipe system should be made of stainless steel pipes. The pipe joints
should be made in a way that makes separation possible in case of e.g.
repairs, movement or similar.
Pipe connections
Water
Air
Note: A 1/2" closing valve should be mounted on the water supply
immediately before the satellite and dirt filter if any.
A 1/4" closing valve should be mounted on the PD supply
immediately before the satellite and dirt filter if any.
7. Assembly
Dimensions see fig.1
It is recommended to mount the system in an appropriate height (approx. 1,
25 m above the floor) on brick or concrete wall. Tighten the satellite with the
enclosed screws and rawl plugs.
SM3
SM-PD
3/4" RG
1/4" RG
6 mm
6 mm

Publicidad

loading

Este manual también es adecuado para:

Sm-pd serieSm3