How To Continue - Daikin EWWQ014KBW1N Manual De Instalación

Ocultar thumbs Ver también para EWWQ014KBW1N:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 28
NOTE
Try to reduce the drilling in the unit to a minimum. If
drilling is impreventable, remove the iron filling
thoroughly in order to prevent surface rust!
It is necessary to read the operation manual deli-
vered with the unit before operating the unit. It will
contribute to understand the operation of the unit
and its electronic controller.
Verify on the wiring diagram all electrical actions
mentioned above, in order to understand the
operation of the unit more deeply.
Close all switch box doors after installation of the
unit.
I do confirm having executed and checked all the above
mentioned items.
Date
Signature
Keep for future reference.
H
OW TO CONTINUE
After installation and connection of the packaged water-cooled water
chiller, the complete system must be checked and tested as
described in "Checks before initial start-up" in the operation manual
supplied with the unit.
Fill out the brief operation instructions form and fix it visibly near the
operating site of the refrigeration system.
EWWQ014~064KBW1N
Packaged water-cooled water chillers
D-EIMHP00901-18EU
N
OTES
Installation manual
5

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Ewwq025kbw1nEwwq033kbw1nEwwq049kbw1nEwwq064kbw1n

Tabla de contenido