Items Included; Tools Needed - Thermador PRO GRAND PROFESSIONAL Serie Manual De Instalación

Ocultar thumbs Ver también para PRO GRAND PROFESSIONAL Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

ITEMS INCLUDED

12 – 1'' (25.4 mm)
screws
4 – ½'' (12.7 mm)
screws
4 – U-Nuts
2 – Upper shelf
brackets
4 – Lower shelf
brackets
2 – Racks
1 – Wall Plate
1 – Installation guide & templates
1. Tape the templates included with the Keep Hot Shelf to
the wall accordingly:
Tape the sheet titled Left Hand Template to bottom
and left end of hood. Align the bottom line of hood
with the top line of the template.
Tape the sheet titled Right Hand Template to
bottom and right end of hood. Align the bottom line
of hood with the top line of the template.
Tape the sheet titled Installation Instruction so that
the arrow at the top of the template aligns with
hood centerline. Align the bottom line of the hood
with the top line of the template.
Left to right sides of the template must be equal to
length of shelf.
2. Mount the (2) upper shelf brackets and the (3) lower
shelf brackets on the 36'' models or (4) lower shelf
brackets for the 48'' model at the locations outlined on
the templates. Secure with (10) 1'' (25.4 mm) screws
provided.
3. Cut template out from around the brackets and remove
from the wall. Do not discard template before the Keep
Hot Shelf is completely installed.
4. Insert U-Nuts onto each of the lower shelf brackets.
5. Install the wall plate by setting the corner notches
(back of wall plate) atop the (2) upper shelf brackets.
Installation Instructions

TOOLS NEEDED

Tape measure
Phillips screwdriver
or drill
Painter's Tape
Sharp knife or
scissors
6. Slide the shelf upwards until the bottom engages with
the lower shelf brackets (Figure 19).
Upper Shelf Brackets x 2
Lower Shelf Brackets x 4
7. Check if the top is properly secured by pulling the top
section of the shelf from the wall.
8. Secure to bottom of shelf with the (4) ½'' (12.7 mm)
screws provided.
Low Backguard Installation
When installing against a combustible surface, a Low
Backguard is required. A THERMADOR Low Backguard
must be purchased separately. See "Installation
Clearances" on page 7.
When using the Flush Island Trim, THERMADOR
recommends a minimum 12'' (305 mm) rear clearance to a
combustible surface (see Figure 1, Cabinet Clearances).
Clearances from non-combustible materials are not part of
the ANSI Z21.1 scope and are not certified by
CSA. Clearances of less than 12'' (305 mm) must be
approved by the local codes and/or by the local authority
having jurisdiction.
LOW BACK
PARTS INCLUDED
Low Back panel
T-20 Torx stainless screws
T-20 Torx drill point screws
Figure 19: 48'' Back of Wall Plate
TOOLS
NEEDED
T-20 Torx head
screwdriver or
drill
Protective Work
Gloves
English 20

Publicidad

Tabla de contenido
loading

Tabla de contenido