Package Contents
W80B Base Station
Installation
Packaging Contents
1. Connect the power and the network using method a or method b.
a. AC Power Option
Note:
If you choose method a, use Yealink supplied power adapter (5V/1.2A).
A third-party power adapter may damage the base station.
If you choose method b, you do not need to connect the power adapter.
Make sure the hub/switch is PoE-compliant.
2. Mount W80B on the wall or on the ceiling.
30 mm
25 mm
Max:4.5mm
(0.177")
Max:3mm
(0.118")
Expansion Screws
A
B
Max:8mm
(0.315")
Min:6.5mm
(0.256")
2
2
Quick Start Guide
b. PoE (Power over Ethernet) Option
Wall-Mount Installation
Power Adapter
(Optional)
IEEE 802.3af compliant
PoE Hub/Switch
E
N
G
L
I
S
H
1