Descargar Imprimir esta página

Delta MultiChoice 13 Serie Instrucciones Para La Instalación página 3

Ocultar thumbs Ver también para MultiChoice 13 Serie:

Publicidad

Idiomas disponibles

Idiomas disponibles

Cartridge Installation
1
A.
2
1
Turn off water supplies. Remove
cover (1), bonnet nut (2) and test cap (3)
from the body. If this is not a thin wall
mounting, the entire plasterguard (4)
may be removed. If screen (5) is in place,
remove before installing cartridge.
Back to back Installation
Normal Installation (changes not required)
Reverse
Installation
Cold
For back to back or reverse installations
(hot on right and cold on left) insert the
cartridge with the "hot side" on the right.
If you are not making a reverse or back
to back installation skip this step and
continue with step 1C.
4
5
3
Hot
13 / 14 Series Installation
B.
2
4
1
Rotate the cartridge (1) so the words
"hot side" (2) appear on the left. Insert
cartridge into valve body as shown. Make
sure the cartridge tubes and O-rings (3)
are properly seated in holes at the base of
the body. Ensure the keys on the body are
fully engaged with the slots in the body (4).
C.
Slide bonnet nut (1) over the cartridge
and thread onto the body. Hand tighten
securely.
3
3
1
4

Publicidad

loading