Package Contents; Preparation; General Pump Information - Utilitech Pro UT58150 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

PACKAGE CONTENTS

Part
Description
A

PREPARATION

Before beginning installation of product, make sure all parts are present. Compare parts with package
contents list. If any part is missing or damaged, do not attempt to assemble the product.
Estimated Installation Time: 2 hours
Tools Required for Assembly (not included): Adjustable wrench, hacksaw, flathead screwdriver, Phillips
screwdriver, tape measure, utility knife, pipe wrench
Parts Required For Assembly (not included): sewage pump basin minimum 18 in. w x 24 in. deep,
basin cover, basin gasket, 2 in. check valve, 2 in. union, gate valve or ball valve as required by codes, 2
in. Sched 40 PVC pipe, 2-step PVC glue system (primer and sealer), cable or zip ties

GENERAL PUMP INFORMATION

1. Sewage pumps are pumps used to remove
waste water that contains solids up to 2 in.
in diameter. The most common application is
for draining bathroom waste water to a sewer
or septic line.
Quantity
Pump
1
1
Main waste
line to sewer
or septic tank
2 in. gate valve
2 in. Check
Three prong
valve
grounded
outlet
equipped
with a
ground fault
interruptor
Pump
Switch
4
2 in. Discharge
Upper level drainage
pipe
Cleanout
Sink
45°
Elbow
A
Union
Flange
Lowes.com
A
Vent pipe
Lavatory

Publicidad

Capítulos

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Ut5813002400380240036

Tabla de contenido