USER'S MANUAL. PROWATCH

INSTALLATION

3
3.1

Power supply

The ProWatch
TELMO
equipment that has been acquired. Hereafter the power supplies and the connections
for DIN Rail and 19" Rack are detailed.

3.1.1 DIN Rail

Must be used the SUB-D25 connectors [2] or [3] placed on the front panel. The
defined power supply is 24V. The positive are the pins 25 and 13 and the negative or
ground are 19, 21 and 23 of the DB 25 connectors [2] or [3] (Please, see Figure 5 for
more details).

3.1.2 19" Rack

It could be supplied through the AC connector [11] placed in the back panel.
3.2

Installation and Start up

The ProWatch
TELMO
The installation of them will be explained in the next lines.
3.2.1 19" Rack.
It has been designed to be assembled in a 19 " Rack (2U chassis).
Once the Rack assembling has finalized, please connect the network cable [11],
the RF cable (back panel) [4] and switch on the main switch [11] placed in the back
panel. The LED ON [6] will light up, all Alarm and Warnings leds [5] will blink. After a
self-test its will switch off. If the module has been properly configured and a TV
broadcasting which has the levels and specifications defined by the user is detected by
the MUX the LED Activity [7] will begin to blink, its means the equipment works properly.
03/2008
TELMO
can be supplied with different voltages depending on the
has been designed in two formats,DIN Rail and 19" Rack.
Page 7