Create an opening in the roof to accommodate the drain assembly
RD-300-AC
With Sump Receiver 18"(457)
Incorrect installation occurs when the circular hole is cut off center of the leader .
pipe extending upwards in the roof.
Step 1:
Place gasket on drain body and align holes.
Step 1:
Place gasket on drain body and align holes.
Step 2:
Place clamps onto gasket, align holes and
insert (4) 5/16-18 screws, do not tighten at
this point
Step 2:
Place clamp onto gasket, align holes and insert
(4) 5/16-18 screws, do not tighten at this point
WARNING
!
Need for Periodic Inspection/Maintenance: This product
must be tested periodically in compliance with local codes,
but at least once per year or more as service conditions
warrant. All products must be retested once maintenance
has been performed. Corrosive water conditions and/or
unauthorized adjustments or repair could render the product
ineffective for the service intended. Regular checking and
cleaning of the product's internal and external components
helps assure maximum life and proper product function.
"F" Deck Flange Installation Instructions
The use of a 10 ga. zinc plated steel flange helps to reduce the risk of a crooked or
off-set of the leader pipe. It enables the roof drain to be adjusted to insulation
height and is recessed in the center to accept the roof drain body and eliminate
the pooling of water in and around the drain. The flange eliminates the need for
reinforcement of the roof drain.
Place the flange over the opening. Flange may be fastened to the roof deck if desired. Line the
flashing clamp on the body of the roof drain up with holes in the flange and secure with screws.
(provided)
4
Typical Installation
Step 3:
Insert adjustable top collar and adjust to
desired height. (Wood blocks, plastic pipes
Step 3:
Insert adjustable top collar and adjust to desired height.
etc... cut to the correct height on each side
(Wood blocks, plastic pipes etc... cut to the correct height and inserted on
each side will ease the installation process.)
Tighten (4) screws
will ease the installation process.)
Tighten (4) screws.
Step 4:
Place dome onto top collar and turn
slightly to lock in place.